Assore Search this siteHomePrint this pageEmail Us
 
HomeGroup profileHighlightsCorporate informationGroup structure of operating companies Group at a glanceBoard of directorsChairman's review Review of operations Ore reserves and mineral resources Corporate governance reportBlack economic empowerment Sustainabiliy report Five-year summary >> Consolidated financial statements >> Company financial statements Notice to membersForm of proxy

Ore reserves and mineral resources

 
RESERVES AND RESOURCES OVERVIEW                            
Assmang (jointly held)                               
                  
MANGANESE   
  Measured and indicated  
Proved and probable  
  
Mineral resources  
    
Mineral reserves    
BLACK ROCK                               
No 1 Seam    130,6     45,1     9,04     109,4     45,1     9,04  
No 2 Seam    160,5     42,4     15,5     –     –     –  
GLORIA                               
No 1 Seam    53,3     38,2     5,5     41,0     38,2     5,5  
No 2 Seam    29,4     29,9     10,1     –     –     –  

RESERVES AND RESOURCES OVERVIEW                                 
Assmang (jointly held)                                           
   Measured and   Proved and        Measured and   Proved and  
IRON ORE    indicated   probable     CHROMITE indicated          probable  
   Mineral resources   Mineral reserves        Mineral resources   Mineral reserves  
     Mt     Fe %     Mt     Fe %          Mt     Cr2O3 %     Mt     Cr2O3 %  
BEESHOEK      109,7     63,71     45,2     64,95     DWARSRIVIER    53,2     39,56     39,6     39,5  
KHUMANI                                                
Bruce      253,2     64,64     235,4     64,64                           
King      379,7     64,51     330,4     64,39                           

Subsidiary companies                                    
      In situ resources (millions)        Reserve (million)  
   Measured     Indicated     Inferred     Total     Proved     Probable     Total  
Mine    tons     tons       tons     resource     tons     tons     reserve  
Rustenburg Minerals    3,8     1,4     8,1     13,3     1,4     0,8     2,2  
Wonderstone    4,9     –     104,8     109,7     4,6          4,6  
Zeerust Chrome    0,9     –     10,6     11,5     0,8          0,8  
Total    9,6     1,4     123,5     134,5     6,8     0,8     7,6  

SALIENT HIGHLIGHTS 2008/2009

Khumani  Production started mid-2008, ramp-up to full production in progress. Reserves increased due to re-design of open pits at higher iron ore prices.The project to increase annual production from 10 Mt to 16 Mt approved.
   
Beeshoek  Reserves increased due to the inclusion of the Village pit. Feasibility study on Village pit in progress.
   
Nchwaning   Development into the Graben area expedited and this will increase knowledge of the geological structure.
   
Dwarsrivier   Geological model re-build using Datamine process SURFIP resulting in an increase in resources and reserves.
   
COMPETENT PERSONS’ REPORT ON ORE RESERVES AND MINERAL RESOURCES 2009

General statement
Assmang’s method of reporting mineral resources and mineral reserves conforms to the South African Code for Reporting Mineral Resources and Mineral Reserves (SAMREC Code) and the Australian Institute of Mining and Metallurgy Joint Ore Reserves Committee Code (JORC Code).

The convention adopted in this report is that mineral resources are reported inclusive of that portion of the total mineral resource converted to a mineral reserve. Resources and reserves are quoted as at 30 June 2009.

Underground resources are in-situ tonnages at the postulated mining width, after deductions for geological losses. Underground mineral reserves reflect milled tonnages while surface mineral reserves (dumps) are in-situ tonnages without dilution. Both are quoted at the grade fed to the plant. Open-cast mineral resources are quoted as in-situ tonnages and mineral reserves are tonnages falling within an economic pit-shell.

The evaluation method is generally ordinary kriging with mining block sizes ranging from 10 x 10 metres to 50 x 50 metres in the plan view.The blocks vary in thickness from 5 to 10 metres. The evaluation process is fully computerised, generally utilising the Datamine and SURPAC software packages.

The mineral resources and mineral reserves are reported on a total basis regardless of the attributable beneficial interest that Assmang has on the individual projects or mines.

Maps, plans and reports supporting resources and reserves are available for inspection at Assmang’s registered office and at the relevant mines.

In order to satisfy the requirements of the Minerals and Petroleum Resources Development Act,Assmang’s operations will have to obtain new mining rights for all properties required to support the planned operations over the next 30 years.The act is effective from 1 May 2004 and the new rights must be obtained within five years from then.The operations are at various stages of application.

Rounding of figures may result in computational discrepancies.

Definitions
The definitions of resources and reserves, quoted from the SAMREC Code, are as follows:

A ‘mineral resource’ is a concentration (or occurrence) of material of economic interest in or on the earth’s crust in such form, quality or quantity that there are reasonable prospects for eventual economic extraction.The location, quantity, grade, continuity and other geological characteristics of a mineral resource are known, estimated from specific geological evidence and knowledge, or interpreted from a well constrained and portrayed geological model. Mineral resources are subdivided, in order of increasing confidence in respect of geoscientific evidence, into inferred, indicated and measured categories.

An ‘inferred mineral resource’ is that part of a mineral resource for which tonnage, grade and mineral content can be estimated with a low level of confidence. It is inferred from geological evidence and assumed but not verified geological and/or grade continuity. It is based on information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that may be limited or of uncertain quality and reliability.

An ‘indicated mineral resource’ is that part of a mineral resource for which tonnage, densities, shape, physical characteristics, grade and mineral content can be estimated with a reasonable level ofconfidence. It is based on exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes. The locations are too widely or inappropriately spaced toconfirm geological and/or grade continuity but are spaced closely enough for continuity to be assumed.

A ‘measured mineral resource’ is that part of a mineral resource for which tonnage, densities, shape, physical characteristics, grade and mineral content can be estimated with a high level of confidence. It is based on detailed and reliable exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes.The locations are spaced closely enough to confirm geological and grade continuity.

A ‘mineral reserve’ is the economically mineable material derived from a measured and/or indicated mineral resource. Itis inclusive of diluting materials and allows for losses that may occur when the material is mined. Appropriate assessments, which may include feasibility studies, have been carried out, including consideration of, and modification by, realistically assumed mining, metallurgical, economic, marketing, legal, environmental, social and governmental factors.These assessments demonstrate at the time of reporting that extraction is reasonably justified. Mineral reserves are sub-divided in order of increasing confidence into probable mineral reserves and proved mineral reserves.

A ‘probable mineral reserve’ is the economically mineable material derived from a measured and/or indicated mineral resource. It is estimated with a lower level of confidence than a proved mineral resource. It is inclusive of diluting materials and allows for losses that may occur when the material is mined. Appropriate assessments, which may include feasibility studies, have been carried out, including consideration of, and modification by, realistically assumed mining, metallurgical, economic, marketing, legal, environmental, social and governmental factors.These assessments demonstrate at the time of reporting that extraction is reasonably justified.

A ‘proved mineral reserve’ is the economically mineable material derived from a measured mineral resource. It is estimated with a high level of confidence. It is inclusive of diluting materials and allows for losses that may occur when the material is mined. Appropriate assessments, which may include feasibility studies, have been carried out, including consideration of, and modification by, realistically assumed mining, metallurgical, economic, marketing, legal, environmental, social and governmental factors.These assessments demonstrate at the time of reporting that extraction is reasonably justified.



MANGANESE

Locality – The manganese mines are situated in the Northern Cape province in South Africa, approximately 60 kilometres northwest of the town of Kuruman. Located at latitude 27°07’50”S and longitude 22°50’50”E, the site is accessed via the national N14 route between Johannesburg and Kuruman, and the provincial R31 road.

History – In 1940,Assmang acquired a manganese ore outcrop on a small hillock known as Black Rock. Several large properties underlain by ore were subsequently found and acquired.Today the Black Rock area is considered to be the largest and richest manganese deposit in the world. Manganese ore operations were extended and today include the Gloria and Nchwaning underground mines. Manganese ore is supplied locally to Assmang-owned smelters, but is mainly exported through Port Elizabeth to Japanese and German customers.

Mining authorisation – The Nchwaning mining lease (ML10/76) comprises an area of 1 877,0587 hectares and is located on the farms Nchwaning (267), Santoy (230) and Belgravia (264). An application for the conversion to a new order mining right was submitted during the 2008 financial year.

The Gloria mining lease (ML11/83) comprises an area of 1 713,1276 hectares and is located on portion 1 of the farm Gloria (266). An application for the conversion to a new order mining right was submitted during the 2008 financial year.

Geology – The manganese ores of the Kalahari manganese field are contained within sediments of the Hotazel Formation of the Griqualand West Sequence, a subdivision of the Proterozoic Transvaal Supergroup. At Black Rock, Belgravia and Nchwaning, the Hotazel, Mapedi and Lucknow Formations have been duplicated by thrusting.The average thickness of the Hotazel Formation is approximately 40 metres.

The manganese orebodies exhibit a complex mineralogy and more than 200 mineral species have been identified to date. The hydrothermal upgrading has resulted in a zoning of the orebody with regard to fault positions. Distal areas exhibit more original and low-grade kutnohorite + braunite assemblages, while areas immediately adjacent to faults exhibit a very high-grade hausmannite ore.The intermediate areas exhibit a very complex mineralogy, which includes bixbyite, braunite and jacobsite amongst a host of other manganese-bearing minerals. A similar type of zoning also exists in the vertical sense. At the top and bottom contacts it is common to have high iron (Fe) and low manganese (Mn) contents while the reverse is true towards the centre of the seam.This vertical zoning has given rise to a mining practice where only the centre 3,5-metre-high portion of the seam is being mined. At the Gloria Mine the intensity of faulting is much less, which also explains the lower grade.

Two manganese seams are present.The No 1 seam is up to 6 metres in thickness, of which 3,5 metres are mined, using a manganese marker zone for control.There is, therefore, minimum dilution. Studies are being undertaken to evaluate the effect of increasing the mining height to 5 metres.

Mineral reserves and ore reserves – Measured resources at Nchwaning are based on the two-thirds of the semivariogram sill range. Areas where the borehole spacing is greater than this distance and up to the sill range are classified as indicated.There are no Inferred resources at Nchwaning. Measured/indicated resources were converted to proved/ probable reserves by an LOM scheduling exercise done by Snowden Mining Consultancy. Geological losses are built into the grade models. Measured resources at Gloria are classified as material available up to 50 metres in front of the mining faces. Material situated further than 50 metres from the face and up to a boundary string around the dense drilled area on Gloria is classified as indicated resources.The rest of the property with limited drill information is classified as Inferred. In the coming year an increase in the measured resources by in-fill drilling is anticipated. At Gloria a 23 percent pillar loss is accounted for in moving measured/indicated resources into proved/probable reserve.

The Nchwaning Mine was diamond drilled from surface at 330-metre centres and the data captured in Excel spreadsheets.The core was logged and 0,5-metre-long, half-core, diamond-saw cut samples were submitted to Assmang’s laboratory at Black Rock for X-ray fluorescence (XRF) analyses. Mn and Fe values were checked by wet chemical analyses. Several standards were used to calibrate XRF equipment, and results are compared with other laboratories on a regular basis.

At Nchwaning a total of 341 boreholes for the No 1 orebody and 372 holes for the No 2 orebody, as well as a total of 26 087 face samples were considered in the grade estimation. The available data for an area was optimised over a thickness of 3,5 metres and exported into data files for computerised statistical and geostatistical manipulation to determine the average grades of Mn, Fe, silica (SiO2), calcium (CaO) and magnesium (MgO).

Ordinary kriging interpolation within Datamine was used to estimate the grade of each 50 x 50 x 3,5-metre block generated within the geological model. Sub-cell splitting of the 50 x 50-metre blocks was allowed to follow the geological boundaries accurately.The relative density of Nchwaning manganese ore was taken as 4,3 t/m3.

Trackless mechanised equipment is used in the board and pillar mining method. Mining in the eastern extremity of Nchwaning occurs at a depth of 200 metres while the deepest (current) excavations can be found at a depth of 519 metres below surface. Gloria Mine is extracting manganese at depths that vary between 160 and 250 metres below surface.

Ore from Nchwaning No 2 mine is crushed underground before being hoisted to a surface stockpile via a vertical shaft. Similarly, ore from the Nchwaning No 3 mine is crushed underground before being conveyed to a surface stockpile via a declined conveyor system. Ore is withdrawn from the surface stockpile and forwarded to two stages of crushing, dry screening and wet screening to yield lumpy and fine products.

At the Gloria Mine, ore is crushed underground before being conveyed to a surface stockpile via a decline shaft. At both plants the finer fractions are stockpiled while the coarser fractions are extracted from the respective product boxes into road haulers, sampled, weighed and stored on stacks ahead of despatch. Samples from each stack are analysed for chemical content and size distribution.This ensures good quality control and enables the ore control department to blend various stacks according to customer demand.

Year-on-year change – The 2009 mineral reserves for the Nchwaning No 1 orebody changed from 115,3 million tonnes in 2008 to 109,4 million tonnes.The mineral resources at Nchwaning No 1 orebody decreased by 7,1 million tonnes to 130,6 million tonnes (137,7 million tonnes).The decrease in resources/reserves is mainly due to depletion.The mineral resources at Nchwaning No 2 orebody decreased slightly to 160,8 million tonnes from 185,2 million tonnes.There is still no market for this ore type.

NCHWANING MINE: 1 BODY MANGANESE RESOURCES/RESERVES
    Tonnes         Tonnes
Nchwaning 1 body resources   Mt     Nchwaning 1 body reserves   Mt   Mn %   Fe %
Measured   42,7     Proved   36,7   46,0   9,9
Indicated   87,9     Probable   72,7   44,6   8,6
Total resources 1 body 2009   130,6     Total reserves 1 body   109,4   45,1   9,04
Total resources 1 body 2008   137,7     Total reserves 1 body   115,3   44,7   8,83
Inferred   none          
NCHWANING MINE: 1 BODY MANGANESE RESOURCES/RESERVES
Nchwaning 2      Tonnes               
body resources      Mt      Mn %      Fe %   
Measured      53,4      42,0      16,3   
Indicated      127,4      42,6      15,2   
Total resources                  
2 body 2009      160,8      42,4      15,5   
Total resources                  
2 body 2008      185,2      42,5      15,4   
Inferred      none             
                 
Measured resources are based on two-thirds of the semivariogram sill range rule. Areas outside this distance are classified as Indicated. Proved reserves = measured resources used in LOM scheduling by Snowden. Probable reserves = indicated resources used in LOM scheduled by Snowden.



Nchwaning borehole locality map showing the mineral resource classification

Procedures for drilling and assaying at Gloria Mine are the same as at Nchwaning. A total of 107 boreholes were considered in the evaluation of the Gloria 1 Body mine.The wide-spaced borehole interval puts some limitation on the evaluation in areas away from current mining faces. A total of 6 439 underground sampling values were used in evaluating areas close to current mining.The boreholes were optimised over a stoping width of 3,5 metres and the relative density was taken as 3,8 t/m3.The seams were evaluated by means of statistical and geostatistical methods to determine the average grades of Mn, Fe, SiO2, CaO and MgO. Ordinary kriging interpolation within Datamine was used to estimate the grade of each 50 x 50 x 3,5-metre block generated within the geological model. Sub-cell splitting of the 50 x 50-metre blocks was allowed to follow the geological boundaries.

Year-on-year change – The 2009 proved reserves at Gloria No 1 body increased to 9,1 million tonnes (6,8 million tonnes) due to re-evaluation and movement of reserves from the probable to the proved category.The probable reserves decreased from 33,6 million tonnes to 31,9 million tonnes.The mineral resources at Gloria No 2 body stayed the same. No markets exist for Gloria 2 body ore at this point in time.

GLORIA MINE: 1 BODY MANGANESE RESOURCES/RESERVES
     Tonnes          
Tonnes
Nchwaning Mt


Gloria Mt
Gloria 1 body resources      Mt      Gloria 1 body reserves     
Mt
Mn %
Fe %
Measured      11,8      Proved     
9,1
38,0
4,9
Indicated      41,5      Probable     
31,9
38,3
5,6
Total resources 1 body 2009      53,3      Total reserves 1 body     
41,0
38,2
5,5
Total resources 1 body 2008      52,5      Total reserves 1 body     
40,4
38,3
5,54
Inferred 2009      128,2                    
Inferred 2008      128,3                      
 
Gloria borehole locality map showing the mineral resource classification   

GLORIA MINE: 2 BODY MANGANESE RESOURCES
Measured resources = immediately available tonnes up to 50-metre in front of mining faces. Indicated resources are as per dense drilling area (see map). Proved reserves = measured resources less 23 percent pillar loss. Probable reserves = indicated resources less 23 percent pillar loss.

       Tonnes             
Gloria 2 body resources      Mt      Mn %      Fe %   
Measured      –      –      –   
Indicated      29,4      29,9      10,1   
Resources 2 body 2009      29,4      29,9      10,1   
Resources 2 body 2008      29,4      29,9      10,1   
Inferred 2009      132,3      –      –   
Inferred 2008      132,3             
                 




HISTORICAL MANGANESE PRODUCTION AT NCHWANING AND GLORIA MINES

Year   Nchwaning Mt


Gloria Mt
2004/2005

  1,97

  0,15
2005/2006

  2,83

  0,13
2006/2007

  2,49

  0,43
2007/2008

  2,73

  0,41
2008/2009

  2,63

  0,51
         
Gloria borehole locality map showing the mineral resource classification   
IRON ORE

Locality – The iron ore division is made up of the Beeshoek Mine located on the farms Beeshoek 448 and Olynfontein 475. The iron ore resources on the farms Bruce 544, King 561, and Mokaning 560, which were formerly known as the BKM Project, are now being developed into what is known as the Khumani Iron Ore Mine. All properties are in the Northern Cape approximately 200 kilometres west of Kimberley.The Beeshoek open-pit operations are situated 7 kilometres west of Postmasburg and the new Khumani open pits will be adjacent to, and southeast of, the Sishen Mine, which is operated by Kumba Resources. Located at latitude 28°30’00”S/ longitude 23°01’00”E, and latitude 27°45’00”S/longitude 23°00’00”E respectively, these mines supply iron ore to both the local and export markets. Exports are railed to the iron ore terminal at Saldanha Bay.

History – Mining of iron ore (mainly specularite) was undertaken as early as 40 000 BC on the farm Doornfontein which is due north of Beeshoek.The potential of iron ore in this region was discovered in 1909, but, due to lack of demand and limited infrastructure, this commodity was given little attention. In 1929, the railway line was extended from Koopmansfontein (near Kimberley) to service a manganese mine at Beeshoek. In 1935,The Associated Manganese Mines of South Africa Limited (Assmang) was formed, and in 1964, the Beeshoek Iron Ore Mine was established, with a basic hand sorting operation. In 1975, a full washing and screening plant was installed and production increased over the years to the current level of approximately 6 million tonnes a year.

Mining authorisation –
The Beeshoek mining lease (ML3/93) comprises an area of 5 685,64 hectares and is located on the farms Beeshoek (448) and Olynfontein (475). An application for the conversion to a new order mining right was submitted during the 2009 financial year.

The Khumani mining lease comprises an area of 7 388,02 hectares and is located on the farms Bruce (544), King (561), Mokaning (560) and McCarthy (559). Mining rights were granted during the 2007 financial year.

Geology – The iron ore deposits are contained within a sequence of early Proterozoic sediments of the Transvaal Supergroup deposited between 2 500 and 2 200 million years ago. In general, two ore types are present, namely laminated hematite ore forming part of the Manganore Iron Formation and conglomerate ore belonging to the Doornfontein Conglomerate Member at the base of the Gamagara Formation.

The older laminated ore types occur in the upper portion of the Manganore Iron Formation as enriched high-grade hematite bodies.The boundaries of high-grade hematite orebodies crosscut primary sedimentary bedding, indicating that secondary hematitisation of the iron formation took place. In all of these, some of the stratigraphic and sedimentological features of the original iron formation are preserved.

The conglomeratic ore is found in the Doornfontein Conglomerate Member of the Gamagara Formation and is lenticular and not persistently developed along strike. It consists of stacked, upward fining conglomerate-gritstone-shale sedimentary cycles.The lowest conglomerates and gritstones tend to be rich in sub-rounded to rounded hematite ore pebbles and granules and form the main orebodies.The amount of iron ore pebbles decreases upwards in the sequence so that upper conglomerates normally consist of poorly sorted, angular to rounded chert and banded iron formation pebbles.

The erosion of the northern Khumani deposit is less than that in the southern Beeshoek area.The result is that Khumani is characterised by larger stratiform bodies and prominent hangingwall outcrops.The down-dip portions are well preserved and developed, but in outcrop the deposits are thin and isolated. Numerous deeper extensions occur into the basins due to karst development. A prominent north-south strike of the ore is visible.The southern Beeshoek orebodies were exposed to more erosion and are more localised and smaller. Outcrops are limited to the higher topography on the eastern side of the properties. Down dip to the west, the ore is thin and deep.The strike of the orebodies is also in a north-south direction, but less continuous.

Haematite is the predominant ore mineral, but limonite and specularite also occur.

Mining operations are all open pit, based on the conventional drill-and-blast, truck-and-shovel operations. Run-of-mine ore is crushed and stored as high or normal grade on blending stockpiles. Ore from the stockpiles is either sent to the wash-and-screen plant or, if contaminated, to the beneficiation plant. The washing and screening plant consists primarily of tertiary crushing, washing, screening, conveying and stacking equipment. The beneficiation plant consists of tertiary crushers; scrubbers; coarse and fine jigs or Larcodems; fine crushing; elutriators and upward flow classifiers; lumpy, fines and scaw product stockpiles; and a rapid load-out facility. No chemical is being used in any of the treatment plants.

Mineral resources and ore reserves – I
n the iron ore operations, the following table shows how the search ellipse (ie the ellipsoid used by the kriging process to determine if a sample is used in the estimation of a block) is used to classify the mineral resource:

     Minimum     Maximum     Search ellipse  
     number     number     settings  
     of samples     of samples     XYZ (m)  
Measured     6     30     100 x 100 x 10  
Indicated     5     30     200 x 200 x 20  
Inferred     4     30     400 x 400 x 40  
                   
Only measured and indicated resources are converted to proved and probable reserves respectively. Modifying factors were applied to these resources and financially optimised.The financial outline is used to define the optimal pit by means of the Lersch-Grossman algorithm.The resources within this mining constraint are defined as reserves.These are categorised into different product types, destined for the different plant processes and scheduled for planning.

The methodology followed to identify targets is initiated with geological mapping, followed by geophysics (ground magnetics and gravity). Percussion drilling is used to pilot holes through overlying waste rock down to the iron ore bodies. Diamond drilling is the next phase, which is usually on a 200 x 200-metre grid. Further infill drilling is carried out at spacing ranging from 100 x 100 metres to 25 x 25 metres, depending on the complexity of the geological structures. Numerous exploration programmes were completed in the last 40 years. A total of 2 832 holes (1 315 holes on Khumani and 1 517 holes on Beeshoek) were drilled. Core samples were logged and split by means of a diamond saw and the half-core is sampled every 0,5 metres. Before submission for assaying, the half-cores were crushed, split and pulverised. Samples with values larger than 60 percent are included in the definition of the orebodies. Any lower-grade samples inside the orebody are defined as internal waste and modelled separately. Each zone is modelled per section, and then wireframed to get a three-dimensional (3D) model.

Ordinary kriging interpolation within Datamine was used to estimate the grade of each 10 x 10 x 10-metre block generated within the geological model. Density in the resource model is calculated using a fourth degree polynomial fit applied to the estimated Fe grade. Densities range from 4,38 t/m3 (60 percent Fe) to 5,01 t/m3 (68 percent Fe). A default density of 3,2 is used for waste.

At Beeshoek all blast holes are sampled per metre, but composited per hole. All holes are analysed for density and blast holes in ore are sampled and analysed for Fe, potassium oxide (K2O), sodium oxide (Na2O), silica (SiO2), aluminium oxide (Al2O3), phosphorus (P), sulphur (S), CaO, MgO, Mn and barium oxide (BaO). Every fifth blast hole is geologically logged per metre, which is used to update the geological model.The chemical results of these holes are used to update the ore block model. Approximately 45 000 blast holes are drilled a year and 9 000 blast holes are used every year to update the models.The major analytical technique for elemental analyses is XRF spectroscopy.Volumetric titration is used as verification method for the determination of total iron in the ore. International standards (eg SARM11) and in-house iron standards are used for calibration of the XRF spectrometer.The Beeshoek laboratory participates in a round robin group that includes seven laboratories for verification of assay results.

BEESHOEK IRON ORE: RESOURCES/RESERVES   
  
                                
                     Total resource    Proved    Probable    Total   
   Measured    Indicated    Inferred    no inferred    reserve    reserve    reserve   
Pit/Area    Mt    Fe %    Mt    Fe %    Mt    Fe %    Mt    Fe %    Mt    Fe %    Mt    Fe %    Mt    Fe %   
                                            
BN    19,89    63,47    0,01    62,67    –    –    19,90    63,46    13,10    64,02    –    –    13,10    64,02   
HF/HB    16,64    64,3    0,30    63,85    –    –    16,94    64,30    2,55    65,24    0,03    66,45    2,58    65,25   
BF    6,95    63,3    0,22    63,58    –    –    7,17    63,30    1,93    63,81    –    –    1,93    63,81   
East Pit    9,14    64,61    0,03    64,19    –    –    9,17    64,61    1,89    65,66    –    –    1,89    65,66   
Village    40,60    63,56    0,09    64,64    –    –    40,89    63,57    24,23    65,53    –    –    24,23    65,53   
GF    3,13    63,81    0,09    61,60    –    –    3,22    63,76    –    –    –    –    –    –   
HH Ext    0,28    62,63    –    –    –    –    0,28    62,63    –    –    –    –    –    –   
HL    3,05    65,17    –    –    –    –    3,05    65,17    0,93    65,70    –    –    0,93    65,70   
West Pit    9,06    62,74    –    –    0,05    61,87    9,06    62,74    0,58    64,45    –    –    0,58    64,45   
Detrital    –    –    –    –    3,70    60,0    –    –    –    –    –    –    –    –   
Total 2009    108,94    63,71    0,74    63,61    3,75    60,0    109,68    63,71    45,21    64,95    0,03    66,45    45,24    64,95   
Total 2008    113,67    63,74    6,65    60,44    3,75    61,87    120,38    63,55    28,0    64,16    0,62    64,03    28,62    64,16   
                                            
Year-on-year change – The 2009 mineral resources at Beeshoek Mine decreased from 113,7 to 108,9 million tonnes, due to the annual production drawdown.The mineral reserves at Beeshoek increased from 28,0 million tonnes to 45,2 million tons.The higher iron ore prices were taken into account in the re-design of the village pit and reserves were declared for this deposit. A feasibility study is to be finalised. Ore reserves at the BN,West and the BF pits were depleted to meet sales requirements.The Khumani Mine took over the Beeshoek export production in mid-2008.


KHUMANI IRON ORE MINE: RESOURCES/RESERVES   
  
                                
                     Total measured    Proved    Probable    Total   
   Measured    Indicated    Inferred    and indicated    reserve    reserve    reserve   
Area    Mt    Fe %    Mt    Fe %    Mt    Fe %    Mt    Fe %    Mt    Fe %    Mt    Fe %    Mt    Fe %   
Bruce A    23,5    64,91    99,0    64,54    0,8    63,37    122,5    64,61    111,06    64,61    0,09    64,38    111,15    64,61   
Bruce B    21,1    65,71    77,0    64,06    8,7    64,64    98,1    64,41    88,01    64,41    4,20    63,92    92,21    64,39   
Bruce C    24,95    65,34    7,66    65,66    1,6    64,60    32,61    65,41    23,85    65,37    8,15    65,68    32,0    65,45   
King/                                             
Mokaning    255,8    64,53    123,9    64,48    17,7    63,98    379,7    64,51    258,4    64,43    71,94    64,26    330,4    64,39   
Khumani    –    –    –    –    12,0    60,00    12,0    60,00    –    –    –    –    –    –   
Detrital                                             
Total 2009    325,4    64,70    307,6    64,42    40,8    62,97    632,9    64,56    481,4    64,51    84,4    64,26    565,7    64,49   
Total 2008    337,9    64,73    306,8    64,43    40,8    62,97    644,7    64,59    274,3    64,64    236,6    64,36    510,9    64,51   


Year-on-year change –
At Khumani Mine the 2009 Ore reserves at Bruce C decreased to 23,85 million tonnes (30,4 million tonnes) due to the production start-up at this open pit.The mineral resources at the other three orebodies stayed the same, and it is being prepared for production.

A re-look at the open pit designs at higher iron prizes caused an increase in total reserve from 510,9 Mt to 565,7 Mt. A feasibility study to increase annual production from 10 Mt to 16 Mt at Khumani is in progress.

HISTORICAL PRODUCTION AT BEESHOEK AND KHUMANI MINES
     Beeshoek      Khumani   
     Year      Mt   
2004/2005   
  6,0        
2005/2006   
  6,2        
2006/2007   
  6,7        
2007/2008   
  4,49      1,85   
2008/2009   
  2,66      6,65   
            
CHROMITE

Locality –
Chromite operations at Dwarsrivier Mine form part of the chrome division of Assmang Limited.The mine is situated on the farm Dwarsrivier 372KT, approximately 30 kilometres from Steelpoort and 60 kilometres from Lydenburg, in Mpumalanga province in South Africa. Located at longitude 30°05’00”E/latitude 24°59’00”S,Assmang purchased the farm from Gold Fields Limited, together with all surface and mineral rights in October 1998.

History – Neighbouring properties to the north and south of Dwarsrivier had existing chrome mining operations at the time of purchase.The feasibility study of the plant, tailings dam and designs for the opencast and underground mines then commenced. After the completion of the consolidated assessment, approval to proceed with the final design and construction work was given in July 1999.

Chromite was obtained from the opencast mining areas at a rate of approximately 0,9 million tonnes a year and these areas were mined out within five years. Underground mining commenced in 2005 at a rate of 1,2 million tonnes a year. Dwarsrivier Mine is specifically geared to deliver high-quality metallurgical grade chromite to the Machadodorp smelter. In addition, the plant has been designed to produce chemical and foundry grade products.

Mining authorisation – An old order mining licence 21/99 was granted in October 1999. It was granted for the mining of chrome and platinum group metals. An application for the conversion to a new order mining right was submitted during October 2007.

Geology – Dwarsrivier Mine is situated in the eastern limb of the Bushveld Complex, which comprises persistent layers of mafic and ultramafic rocks, containing the world’s largest known resources of platinum group metals, chromium and vanadium. The mafic rocks termed the Rustenburg Layered Suite, are approximately 8 kilometres thick in the eastern lobe, and are divided formally into five zones.

The rocks of the marginal zone at the base of the succession consist mainly of pyroxenites with some dunites and harzburgites. Above the marginal zone, the lower zone comprises mainly pyroxenites, harzburgites and dunite, and is present only in the northern part of the eastern lobe, and only as far south as Steelpoort.The appearance of chromitite layers marks the start of the critical zone, economically the most important zone.The layers are grouped into three sets termed the lower, middle and upper groups.The sixth chromitite seam in the Lower Group (LG6), is an important source of chromite ore and is the orebody being mined at Dwarsrivier Mine. In the eastern lobe, in the vicinity of Dwarsrivier, the strike is nearly north-south, with a dip of approximately 10 degrees towards the west. Average thickness of the LG6 seam is about 1,86 metres in the Dwarsrivier area. Pipe-like dunite intrusions are evident in the area, as well as dolerite dykes that on average strike northeast-southwest. No significant grade variation is evident, especially not vertically in the ore seam. Small, insignificant regional variations do, however, exist.

Mineral resources and ore reserves – Information was obtained from boreholes with 300- to 150-metre grid spacing. Resources were determined with a decreasing level of confidence.

  • Measured resource (150 metres drill grid spacing);
  • Indicated resource (300 metres drill grid spacing); and
  • Inferred resource (drill grid spacing greater than 300 metres).


All possible resources down to a mineable depth of 350 metres below ground level have been considered.

A strategy to ensure the availability of adequate information ahead of mining activities is in place.The strategy is to ensure all mining areas falling within the first five years of the life of mine plan contain proved reserves.Vertical diamond drilling holes are used, except where information is needed to clarify large-scale fault planes.The mineral resource at Dwarsrivier Mine is based on a total of 230 diamond drill holes that have been used for grade estimation and orebody modelling purposes.The drill core is NQ size and is geologically and geo-technically logged.The collar position of the drill holes is surveyed, but no down-hole surveys are done, and the holes are assumed to have minimal deflection.

The chromitite seam is bounded above and below by pyroxenites. As such, the ore horizon is clearly defined.The core is sampled from the top contact downwards at 0,5-metre intervals.The core is split and half is retained as reference material in the core sheds.The other half is crushed and split into representative samples, which are crushed and pulverised for chemical analysis.The samples are analysed fusion/ICP-OES for chrome oxide (Cr2O3), SiO2, FeO,Al2O3, MgO and CaO. Three laboratories, all ISO 17025 accredited for this method, are used. Every tenth sample is analysed in duplicate. SARM 8 and SARM 9 standards, as well as in-house reference material (CRI), are included every 20 to 30 samples in each batch.The density for each sample is measured using a gas pycnometer.

The Datamine process SURFIP is now employed to accurately follow the LG6 chrome seams’ upper and lower contacts and generate wireframes of the ore zone. A cut-off value of 35 percent Cr2O3 was used to distinguish between ore and waste. Mineral resources have been calculated using ordinary kriging, where Cr2O3-, FeO-,Al2O3-, MnO and MgO-contents of the LG6 seam and densities were determined, using block sizes of 50 x 50 x 4 metres.

During mining, a slightly diluted run of mine ore is fed to the beneficiation plant.This decreases the average grade from approximately 40% Cr2O3 to 37% Cr2O3. An addition of approximately 9% of waste material results in this 3% Cr2O3 grade decrease. In the dense media separation part of the plant, the coarse fraction is upgraded to 40% Cr2O3, with a yield of 60%. In the spiral section of the plant the finer fraction is upgraded to 44% Cr2O3, and 46% Cr2O3 respectively, for metallurgical grade fines and chemical grade fines. Foundry sand is also produced with a similar grade to that of the chemical grade fines. A 67% yield is achieved in the spiral circuit.

Year-on-year change – When compared to 2008, the 2009 mineral reserves increased by 3,2 million tonnes to 39,6 million tonnes (36,4 million tonnes) and the mineral resources show an increase of 9,2 million tonnes to 53,2 million tonnes (44,02 million tonnes).The reason for the change is the more accurate delineation of the seam by means of the Datamine process SURFIP. Excluded from this plan are the inferred mineral resources and material situated deeper than 350 metres below ground level.

DWARSRIVIER MINE: CHROME RESOURCES/RESERVES PLAN
    Tonnes               Tonnes        
Resources   Mt   Cr2O3 %   FeO %   Reserves   Mt   Cr2O3 %   FeO %
Measured   21,30   39,60   23,27   Proved   13,9   39,78   23,23
Indicated   31,90   39,39   23,04   Probable   25,7   39,40   23,0
Total measured and                
indicated 2009   53,2   39,56   23,11   Total reserves   39,6   39,5   23,1
Total measured and                
indicated 2008   44,02   39,16   22,79   Total reserves   36,4   39,16   22,79
Inferred   53,11   39,00   22,71                
Dwarsrivier Mine mineral resources and reserves


HISTORICAL PRODUCTION AT DWARSRIVIER CHROME MINE

Year      Mt   
2004/2005      0,92   
2005/2006      0,82   
2006/2007      1,01   
2007/2008      1,24   
2008/2009      1,03   
COMPETENCE
The competent person with overall responsibility for the compilation of the mineral reserves and resources is Paul van der Merwe, PrSciNat, an ARM employee. He consents to the inclusion in this report of the matters based on the information in the form and context in which it appears.

Paul van der Merwe graduated with a BSc (Hons) in Geology from Free State University. He spent four years as an exploration geologist for FOSKOR. He then joined the Uranium Resource Evaluation Group of the then Atomic Energy Corporation of South Africa for 12 years.While employed there he studied geostatistics and spent some time at the University of Montreal, Canada. In 1991, he joined Anglovaal Mining (now ARM) in the Geostatistics Department and evaluated numerous mineral deposit types for this group in Africa. In 2001, he was appointed as Mineral Resource Manager for the group. He is registered with the South African Council for Natural Scientific Professions as a Professional Natural Scientist in the field of practice of geological Science, registration number 400498/83, and as such is considered to be a competent person.

All competent persons at the operations have sufficient relevant experience in the type of deposit and in the activity for which they have taken responsibility. Details of the competent persons are available from the company secretary at Assmang on written request.

The following competent persons were involved in the calculation of mineral resources and reserves.

Iron ore  M Burger PrSciNat/ S van Niekerk PrSciNat
Manganese ore  B Rusive PrSciNat
Chrome ore A Pretorius PrSciNat (external consultant)
   
   
P J van der Merwe
31 August 2009